Fearna Storage project57°04′41″N 5°12′32″W / 57.078°N 5.209°W ![]() The Fearna Storage project is a proposed pumped storage hydroelectricity (PSH) scheme in the Scottish Highlands.[1][2][3][4] The project is a collaboration between SSE and Gilkes Energy.[5] If built, the project will be one of the largest pumped-hydro schemes in Scotland, storing 37GWh of energy, equating to 20 hours of generation at the maximum capacity of 1.8GW.[1] GeographyThe project is an extension to the Glen Garry hydroelectric scheme, which includes the reservoir Loch Quoich, situated west of Loch Garry approximately 40 km northwest of Fort William. Loch Fearna is a small lake roughly 1 km from Loch Quoich.[6] Water from Loch Quoich will be pumped up to Loch Fearna over an average hydraulic head of 376m, with relatively short tunnels needed to connect the two.[1] The water to be displaced would use 11% of the storage capacity of Loch Quoich.[7] Current statusA planning application under Section 36 of the Electricity Act 1989 was submitted in March 2025. If approved, it is expected that construction and commissioning will take seven years.[8] See also
References
External links
|
Portal di Ensiklopedia Dunia